What's Covered in Your Tune Up?

 

19-Point Gas Furnace Tune Up

  • Cycle the furnace 
  • Blower - inspect assembly  
  • Clean or change filter (customer supplied or purchased from contractor)  
  • Verify limit operations  
  • Measure and record delta T  
  • Clean flame sensor  
  • Clean and cycle condensate pump (90% or better EF)  
  • Measure and record amp draw to blower  
  • Measure and record amp draw inducer 
  • Inspect flue pipe
  • Measure and verify ignition protocols  
  • Clean burners  
  • Tighten electrical connections  
  • Clean and adjust pilot assembly
  • Clean exterior  
  • Measure and adjust gas pressure  
  • Brush and inspect heat exchanger 
  • Conduct bubble test for gas leaks
  • Vacuum burner compartment 

11-Point Air Conditioner Tune Up

  • Cycle the air conditioner 
  • Test total refrigerant pressure  
  • Test outdoor ambient temperature  
  • Test indoor ambient temperature test  
  • Test amperage draw on fan motors  
  • Oil motors  
  • Check integrity of electrical contactors  
  • Tighten electrical connections  
  • Check indoor coils (drain properly)
  • Inspect and wash outdoor coils
  • Change fuses

17-Point Fireplace Tune Up

  • Check and clean pilot assembly
  • Check igniter
  • Test thermocouple/pile voltage
  • Check and clean burners
  • Limited blower cleaning
  • Check current to gas control valve
  • Check for proper on/off switch and t-stat operation
  • Check gas pressure
  • Check for gas leaks
  • Ensure proper safety switch operation
  • Check vent for blockage
  • Check for spillage at flue
  • Check and clean glass door and gaskets
  • Check gas log condition (if applicable)
  • Check remote control functionality
  • Touch up firebox paint
  • Replace ember bed material

18-Point Gas Boiler Tune Up

  • Cycle the boiler
  • Check water level limits
  • Check T&P for operation
  • Verify limit operations
  • Measure and record delta T of water
  • Clean flame sensor
  • Check expansion tank, if present
  • Rate/set boiler input
  • Inspect flue pipe
  • Measure and verify ignition protocols
  • Clean burners
  • Tighten electrical connections
  • Clean and adjust pilot assembly
  • Clean exterior
  • Measure and adjust gas pressure
  • Inspect heat exchanger for sooting or roll out
  • Conduct bubble test for gas leaks
  • Vacuum burner compartment